Dominica International Airport (Under Construction)
Daylight today(Aug 29, 2026, local time)
About 12h 28m of daylight. Civil twilight (dawn/dusk) approximates the FAA definition of night for logging and currency. Times are computed and approximate — verify with official sources.
About Dominica International Airport (Under Construction)
Dominica International Airport is an international airport under construction in Wesley, Dominica. It will replace Dominica's current much smaller international airport, Douglas-Charles Airport. It will have a runway length of 3000m allowing for wide body aircraft from North America, Europe, Asia and Africa. It is expected to be completed in 2027.
Summary from Wikipedia licensed under CC BY-SA.
Live traffic nearby
Aircraft currently within ~40 nm, from live ADS-B. Positions are approximately real-time — not for navigation.
Live ADS-B by adsb.lol & the OpenSky Network. Not for navigation.
Map
Runway centrelines, navaids and overlapping airspace. Tiles © OpenStreetMap contributors. Reference only — not for navigation.
Runways (1)
| Runway | Length | Width | Surface | Lighting | Status |
|---|---|---|---|---|---|
| 15 / 33 | 9,843 ft / 3,000 m | 148 ft | Asp | Lighted | Closed |
Frequently asked questions
Where is Dominica International Airport (Under Construction) located?
Dominica International Airport (Under Construction) is closed located in Wesley, Dominica.
How many runways does Dominica International Airport (Under Construction) have?
Dominica International Airport (Under Construction) has 1 runway, the longest being 9,843 ft / 3,000 m.
Is the information on this page suitable for flight planning?
No. Dominica International Airport (Under Construction) data here is for reference and training only — not for navigation. Always consult official sources and current charts before any flight.